Operation of Two .75-Million Gallon Reservoirs, a Booster station, Nitrate and Perchlorate Ion-Exhcnage Treatment Facility, a Ground Water Production Well, and

Summary

SCH Number
2018079019
Lead Agency
Fontana, City of (City of Fontana)
Document Title
Operation of Two .75-Million Gallon Reservoirs, a Booster station, Nitrate and Perchlorate Ion-Exhcnage Treatment Facility, a Ground Water Production Well, and
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2018

Document Description
Water Detention Basin SWRCB, as the responsible agency, will be issuing a water supply permit. The San Gabriel Valley Water Company-Fontana (SGVWC-Fontana) constructed a .75 million gallon reservoir and drilled a ground water production well, (F21B). SGVWC-Fontana will also construct a booster station, nitrate and perchlorate ion-exchange treatment facilities, a water detention basin, a second .75 million gallon reservoir, and associated piping-to connect the components to the rest of the system and for discharge. Perimeter lighting will be added to the site. New block wall fencing and wrought iron fencing with pilasters will also be installed on the 75,673 ft property. The project will provide for the operation of the system.

Contact Information
Eric Zuniga
SWRCB
464 W. 4th St., Room 437
San Bernardino, CA 92401

Phone : (909) 383-4328

Location

Counties
San Bernardino

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
464 W. 4th St., Room 437, San Bernardino, CA 92401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes