Operation of Two .75-Million Gallon Reservoirs, a Booster station, Nitrate and Perchlorate Ion-Exhcnage Treatment Facility, a Ground Water Production Well, and
Summary
- SCH Number
- 2018079019
- Lead Agency
- Fontana, City of (City of Fontana)
- Document Title
- Operation of Two .75-Million Gallon Reservoirs, a Booster station, Nitrate and Perchlorate Ion-Exhcnage Treatment Facility, a Ground Water Production Well, and
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/18/2018
- Document Description
- Water Detention Basin SWRCB, as the responsible agency, will be issuing a water supply permit. The San Gabriel Valley Water Company-Fontana (SGVWC-Fontana) constructed a .75 million gallon reservoir and drilled a ground water production well, (F21B). SGVWC-Fontana will also construct a booster station, nitrate and perchlorate ion-exchange treatment facilities, a water detention basin, a second .75 million gallon reservoir, and associated piping-to connect the components to the rest of the system and for discharge. Perimeter lighting will be added to the site. New block wall fencing and wrought iron fencing with pilasters will also be installed on the 75,673 ft property. The project will provide for the operation of the system.
- Contact Information
-
Eric Zuniga
SWRCB
464 W. 4th St., Room 437
San Bernardino, CA 92401
Phone : (909) 383-4328
Location
- Counties
- San Bernardino
Notice of Determination
- Approving Agency
- SWRCB
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 464 W. 4th St., Room 437, San Bernardino, CA 92401
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.