Silicon Valley Clean Water Wastewater Treatment Plant Solar Photovoltaic Energy Project

Summary

SCH Number
2018078320
Lead Agency
Silicon Valley Clean Water
Document Title
Silicon Valley Clean Water Wastewater Treatment Plant Solar Photovoltaic Energy Project
Document Type
NOE - Notice of Exemption
Received

Document Description
The project includes the installation of solar panels and ancillary utility facilities within the developed wastewater treatment plant (WWTP) property. The project includes the installation of solar panel facilities within thr developed SVCW wastewater treatment plant property. The proposed solar panels would be installed at the existing storm water storage basin and on the roof of the control building. The solar panels would occupy a total of approximately 100,000 square feet on the WWTP property at these locations. The proposed solar panels will have an estimated useful life of approximately 20 years.

Contact Information
Teresa Herrera
Silicon Valley Clean Water
1400 Radio Road
Redwood City, CA 96065

650-591-7121

Location

Cities
Redwood City
Counties
San Mateo
Cross Streets
1400 Radio Road
Zip
94065

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 15301, 15303
Reasons for Exemption
The project consist of minor alterations to equipment and utility connections at an existing wastewater treatment facility to provide electric solar power. No expansion of the existing use is proposed.
Download CSV New Search