Phase 2: Arden Way Mainline Extension/Replacement Project

Summary

SCH Number
2018078239
Public Agency
Carmichael Water District
Document Title
Phase 2: Arden Way Mainline Extension/Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/13/2018
Document Description
This project will allow Carmichael Water District to abandon aging asbestos cement pipe infrastructure. Other distribution network improvements as a result of this project include creating a looped system and improving fire flow.

Contact Information

Name
Scott Bair
Agency Name
Carmichael Water District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Other Location Info
Carmichael

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
15282(k)
Reasons for Exemption
The project includes the installation of less than 1 mi of pipe in existing public ROW, therefore the project is statutorily exempt.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print