Photovoltaic System at Robert P. Heidman Elementary School

Summary

SCH Number
2018078031
Public Agency
Tustin Unified School District
Document Title
Photovoltaic System at Robert P. Heidman Elementary School
Document Type
NOE - Notice of Exemption
Received
Posted
7/2/2018
Document Description
Solar arrays would be installed on top of two new elevated shade structure on a portion of an existing parking lot and other on a future parking lot. The system would include 320 modules and produce about 113,600 watts or about 114 kilowatts of electric power. Approximately 364 feet of electrical conduit would be installed in a buried trench from the structure, through the campus, to the school's existing electrical system at the front of the school. The photovoltaic system and shade structure would be a campus improvement, and its beneficiaries include the school's students, faculty, and staff and members of the community.

Contact Information

Name
David Miranda
Agency Name
Tustin Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Tustin
Counties
Orange
Cross Streets
15571 Williams St

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 15303
Reasons for Exemption
New construction or conversion of small structures; The shade structure and electrical connections would be installed in previously disturbed areas of a developed school campus and the PV system would be appurtenant to the existing school facility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print