North Drainage Canal (NDC) Lift Pump Station Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018072073
- Lead Agency
- Reclamation District 1000
- Document Title
- North Drainage Canal (NDC) Lift Pump Station Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/17/2018
- Present Land Use
- AG/AG/AG-80
- Document Description
- The project consists of construction and operation of a new tailwater recovery lift pump station with 120-cubic foot per second capacity on the Sankey Canal near the NDC, allowing for reuse of agricultural tailwater accumulated in the RD 1000 drainage canal system. The project would be constructed by the Natomas Central Mutual Water Company within an existing NCMWC-owned and -maintained canal and access road. B/c this property will be transferred to RD 1000 in the future, NCMWC is seeking an encroachment permit from RD 1000.
- Contact Information
-
Paul Devereux
Reclamation District 1000
Lead/Public Agency
1633 Garden Highway
Sacramento, CA 95833-9706
Phone : (916) 922-1449
Location
- Coordinates
- 38°47'52"N 121°34'45"W
- Counties
- Sutter
- Cross Streets
- Power Inn Rd and Howsley Rd
- Zip
- 95659
- Total Acres
- 0.98
- Parcel #
- nearest 35-130-017
- State Highways
- 99
- Airports
- Vestal Strip
- Waterways
- Sacramento River, Sankey Canal, NDC
- Township
- 11
- Range
- 4E
- Section
- 18
- Base
- MDBM
- Other Location Info
- Verona
Notice of Determination
- Approving Agency
- Reclamation District 100
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1633 Garden Highway Sacramento, CA 95833
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.