SJ County Bridge Rehab

5 Documents in Project

Summary

SCH Number
2018072070
Lead Agency
California Department of Transportation, District 3
Document Title
SJ County Bridge Rehab
Document Type
NOD - Notice of Determination
Received
Posted
9/14/2018
Document Description
Caltrans proposes to rehabilitate mechanical and electrical systems that enable the operation of the Old River Bridge (#29 0045) on SR 4 at the county line of Contra Costa and San Joaquin counties. The Old River Bridge as it currently operates is a narrow, two-lane span without shoulders or sidewalks. It crosses Old River, which serves as the county line between Contra Costa and San Joaquin Counties. In this area, Old River is a navigable waterway under the jurisdiction of the United States Coast Guard. The swing span (the moveable portion of the bridge) is the central part of the bridge deck, which swings out perpendicular to the rest of the structures, opening a passage for marine traffic. The mechanical and electrical components that support operation of the bridge date back to the construction of the control house in 1938, when the operation of the swing span was first mechanized. The equipment is old and appears archaic even to the uneducated eye. The work will be limited to repair and replacement of the mechanical and electrical components, most of which reside within the bridge structure.

Contact Information

Name
Janet Bailey
Agency Name
California Department of Transportation, District 3
Contact Types
Lead/Public Agency

Location

Counties
Contra Costa, San Joaquin
Cross Streets
SR 4 at Old River
State Highways
4
Waterways
Old River
Other Location Info
Discovery Bay

Notice of Determination

Approving Agency
caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print