Northwest Levee Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2019- 0088-R3)

4 Documents in Project

Summary

SCH Number
2018072062
Lead Agency
Bethel Island Municipal Improvement District (BIMID)
Document Title
Northwest Levee Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2019- 0088-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0088-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Regina Espinoza, Bethel Island Municipal Improvement District (BIMID). BIMID will improve the levee between stations 0+00 to 130+00 to Bulletin 192-82 standards which includes raising the levee crest to an elevation to 10. 5 feet above mean sea level, widening the levee crest to 22 feet and installing an all-weather road on the crown, installing new or enhancing existing riprap on the waterside slope as needed to minimize scour and maintain a 2H: 1V waterside slope, and flattening the landside slope to 5H: 1V. The project also includes habitat enhancement through the creation of a 10-foot wide waterside bench between stations 55+00 to 90+00 and 103+00 to 113+00 planted with native emergent aquatic vegetation and woody species.

Contact Information

Name
Brianne O'Rourke
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Bethel Island Municipal Improvement District
Contact Types
Project Applicant

Location

Counties
Contra Costa
Other Location Info
Taylor Slough, Bethel Island

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.