Northwest Levee Improvements and Stone Road Seepage Reduction Project

2 Documents in Project

Summary

SCH Number
2018072062
Lead Agency
Bethel Island Municipal Improvement District
Document Title
Northwest Levee Improvements and Stone Road Seepage Reduction Project
Document Type
NOD - Notice of Determination
Received

Document Description
BIMID proposes to conduct a project at two different sites. Site 1 - would implement improvements along the waterside and landslide of the Taylor Slough levee on the northwest side of the island west of Bethel Island Road and north of Canal Road between levee stations 0+00 and 130+00. Site 2 would implement measures to reduce seepage along the landslide of the Sand Mound Slough levee on the south side of the island along windsweep Road and Stone Rd between levee stations 340+00 and 450+00. The project will alleviate or minimize the existing levee deficiencies including steep waterside slopes, active scour, seepage through the levee, and potentially liquefiable material within the levee and foundtion. The project integrates levee improvements and habitat enhancement features and provides export water supply reliability by protecting one of the eight western islands. The project is tenatively scheduled for construction from 2019 to 2021.

Contact Information
Regina Espinoza
Bethel Island Municipal Improvement District
3085 Stone Rd PO Box 244
Bethel Island, CA 94511

925-684-2210

Location

Coordinates
38°01'41"N 121°38'26"W
Counties
Contra Costa
Cross Streets
Canal Rd, Stone Rd, Bethel Island Rd, Windsweep Rd and Gateway Rd
Zip
94511
Total Acres
40
Parcel #
029-040-011
Waterways
Dutch, Sand Mound, Taylor and Piper Sloughs
Township
2N
Range
3E
Section
10
Base
MD
Other Location Info
Bethel Island, Jersey Island
Other Information
Bethel Island in Wetlands Land Grant on Jersey Island, CA

Notice of Determination

Approving Agency
Bethel Island Municipal Improvement District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
3085 Stone Road, Bethel Island, CA 94511

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search