Contanda Marine Terminal Expansion

2 Documents in Project

Summary

SCH Number
2018072047
Lead Agency
Port of Stockton
Document Title
Contanda Marine Terminal Expansion
Document Type
NOD - Notice of Determination
Received
Posted
12/6/2018
Present Land Use
port district/industrial use
Document Description
Contanda is proposing to expand an existing bulk liquid terminal at the port to increase storage capacity and annual throughput (hereafter referred to as the proposed project). As part of the proposed project, Contanda would remove 14 existing aboveground storage tanks and replace them with five new ASTs of greater capacity. The proposed project also includes removing the existing west truck rack; removing and replacing approx 70% of the existing secondary containment; and installing new pumps and piping to transfer liquids between the new ASTs, vessels, rail cars, and trucks. No new buildings or infrastructure improvements are required; however, existing water lines would be relocated. No berth or in-water work is proposed.

Contact Information

Name
Jason Cashman
Agency Name
Port of Stockton
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Port Rd A at Port Rd B
Zip
95203
Total Acres
2.61
Parcel #
145-020-04
State Highways
5
Railways
BNSF, UP
Schools
Mult
Waterways
San Joaquin River
Township
1N
Range
6E
Section
7
Base
MD

Notice of Determination

Approving Agency
Port of Stockton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print