Contanda Marine Terminal Expansion
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018072047
- Lead Agency
- Port of Stockton
- Document Title
- Contanda Marine Terminal Expansion
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/6/2018
- Present Land Use
- port district/industrial use
- Document Description
- Contanda is proposing to expand an existing bulk liquid terminal at the port to increase storage capacity and annual throughput (hereafter referred to as the proposed project). As part of the proposed project, Contanda would remove 14 existing aboveground storage tanks and replace them with five new ASTs of greater capacity. The proposed project also includes removing the existing west truck rack; removing and replacing approx 70% of the existing secondary containment; and installing new pumps and piping to transfer liquids between the new ASTs, vessels, rail cars, and trucks. No new buildings or infrastructure improvements are required; however, existing water lines would be relocated. No berth or in-water work is proposed.
- Contact Information
-
Jason Cashman
Port of Stockton
Lead/Public Agency
2201 W. Washington Street
Stockton, CA 95203
Phone : (209) 946-0246
Location
- Coordinates
- 37°56'57.17"N 121°19'22.89"W
- Cities
- Stockton
- Counties
- San Joaquin
- Cross Streets
- Port Rd A at Port Rd B
- Zip
- 95203
- Total Acres
- 2.61
- Parcel #
- 145-020-04
- State Highways
- 5
- Railways
- BNSF, UP
- Schools
- Mult
- Waterways
- San Joaquin River
- Township
- 1N
- Range
- 6E
- Section
- 7
- Base
- MD
Notice of Determination
- Approving Agency
- Port of Stockton
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 2201 West Washington St., Stockton, CA 95203
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.