San Joaquin Culverts Rehabilitation Project

5 Documents in Project

Summary

SCH Number
2018072030
Lead Agency
Caltrans, District 6 - Fresno/Bakersfield (California Department of Transportation, District 6)
Document Title
San Joaquin Culverts Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2020
Project Applicant
Caltrans

Document Description
The Project consists of replacing the existing 94-foot long, 36-inch diameter corrugated metal pipe (CMP) culvert crossing State Route 4 with a new 91-foot long 48-inch diameter reinforced concrete pipe (RCP) culvert. Work will include removal of roadway, 2,200 cubic yards of roadway fill, and the existing CMP culvert. The excavation will be lined with 5 cubic yards of clean gravel with the new pre-cast RCP culvert placed on the gravel bed. The excavation will then be backfilled with approximately 80 cubic yards of concrete slurry, followed by approximately 1,440 cubic yards of previously excavated roadway fill.

Contact Information
Nicholas White
Regional Water Quality Control Board
11020 Sun Center Drive #200
Rancho Cordova, CA 95670

Phone : (916) 464-4856

Location

Counties
San Joaquin
Other Location Info
Victoria Island Farms on State Route 4 in Holt

Notice of Determination

Approving Agency
Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2018072030_San Joaquin Culverts   PDF 364 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print