Gerber Community School Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018072016
- Lead Agency
- Sacramento County Office of Education (SCOE)
- Document Title
- Gerber Community School Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/12/2018
- Present Land Use
- vacant/SC/Commercial and office
- Document Description
- The Gerber Community School would consist of three single-story buildings that house classrooms, culinary classrooms, offices, and a multi-purpose room around a central outdoor courtyard with a shade structure and a multi-sport physical education area. The school site includes a parking lot with approx 30 stalls and a drop-off area with two entrances to the parking lot would be located off Fernridge Dr. The school could accommodate up to approx 135 students in grades 7 through 12 and approx 10 staff. However, the school is only expected to serve 40 students under typical conditions. SCOE is planning to complete the detailed design of the school and site during 2019, complete the construction process during 2019 and 2020, and open the school in late 2020.
- Contact Information
-
Tammy Sanchez
Sacramento County Office of Education
Lead/Public Agency
P.O. Box 269003 10530 Mather Blvd
Sacramento, CA 95626
Phone : (916) 228-2551
Location
- Coordinates
- 38°20'50.47"N 121°24'22.4"W
- Cities
- Sacramento
- Counties
- Sacramento
- Cross Streets
- Gerber Rd and Fernridge Dr
- Zip
- 95626
- Total Acres
- 3.82
- Parcel #
- 115-0430-075, -076
- State Highways
- SR 99
- Waterways
- Elder Crk
Notice of Determination
- Approving Agency
- Sacramento County Office of Education
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 10474 Mather Blvd, Sacramento, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.