Feasibility Study and Remedial Action Plan for Lot 1, Lot 2 and the Uplands Portion of Lot 3, Campus Bay Site

2 Documents in Project

Summary

SCH Number
2018072012
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Feasibility Study and Remedial Action Plan for Lot 1, Lot 2 and the Uplands Portion of Lot 3, Campus Bay Site
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2019

Document Description
The project is designed tor mediate and prevent exposure to volatile organic compounds (VOCs) and metals that are above screening levels in soil, groundwater and soil vapor. The selected alternative includes: in-site groundwater treatment and soil vapor extraction (SVE); focused soil excavation in the Lot 3 Subarea (excavation of approximately 7,900 cubic yards); installation of a cap; monitored natural attenuation of groundwater; monitoring and maintenance; and institutional controls. The recommended cleanup alternative is designed to protect people and the environment.

Contact Information
Lynn Nakashima
Department of Toxic Substances Control
Site Mitigation and Restoration Program 700 Heinz Avenue
Berkely, CA 94710

Phone : (510) 540-3839

Location

Cities
Richmond
Counties
Contra Costa
Cross Streets
1415 South 47th Street, Richmond

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Richmond Public Library 325 Civic Center Plaza Richmond, CA 94804 (510) 620-6561 ; call for hours Department of Toxic Substances Control 700 Heinz Avenue Berkeley, CA 94710 (510) 540-3800; call for appointment DTSC's EnviroStor website: http://www.eiwirostor.dtsc.ca.gov/public

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018072012_Campus Bay Site   PDF 2010 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print