San Bernardino International Airport Eastgate Building 1 Final EIR
3 Documents in Project
Summary
SCH Number
2018071038
Lead Agency
San Bernardino International Airport Authority
Document Title
San Bernardino International Airport Eastgate Building 1 Final EIR
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2018
Present Land Use
Public Facility/Public Facility
Document Description
The SBIAA, in conjuction with the project developer, Hillwood, plan to develop an Air Cargo Logistics Center on an approximately 101.52-acre site (gross acreage) within the Airport property boundary. The City of San Bernardino must approve a development plan for the proposed project and will serve as a CEQA Responsible Agency. The site is adjacent to Taxiway "E", where the air cargo operations will connect to the SBIA aircraft operations. The project plans include a new aircraft ramp that will connect to the distribution center. The main aircraft that will service the site are B373s and 767s. The ultimate project that will be developed by the project developer is an Air Cargo Logistics Center, which consists of a 658,500 SF distribution center; 1,999 employee parking stalls; 380 trailer parking stalls; a 25,000 SF maintenance building; a 25,000 SF ground support equipment (GSE) service building; aircraft parking/docking for 16 aircraft; onsite infrastructure to support the aircraft operations and distribution center operations; and two new bridges to provide site access from Third Street. Construction is anticipated to begin in November 2018 and the Air Cargo Logistics Center is anticipated to be completed and operational by the end of 2019.
Note: See NOD for full project description
Contact Information
Name
Mike Burrows
Agency Name
San Bernardino International Airport Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Bernardino
Counties
San Bernardino
Cross Streets
north of Taxiway "E" and west of 100th Street and south of 3rd Street
Zip
92408
Total Acres
101.52
State Highways
10
Airports
SBIA
Township
1S
Range
3W
Section
6
Base
SBBM
Notice of Determination
Approving Agency
San Bernardino International Airport Authority
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.