Gaviota Culvert Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0286-R5)

4 Documents in Project

Summary

SCH Number
2018071001
Lead Agency
Caltrans, District 5 - San Luis Obispo/Santa Barbara (California Department of Transportation, District 5)
Document Title
Gaviota Culvert Replacement (Lake or Streambed Alteration Agreement No. 1600-2019-0286-R5)
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2020

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0286-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation (District 5). The project consists of the replacement of an existing 6’X6’ reinforced concrete box/6’ reinforced concrete pipe (RCB/RCP) culvert along SR-101. The replacement culvert would be approximately 500 feet long and composed of only RCP. The Project also includes rock slope protection, an end wall and wing walls at the outlet, and a headwall at the inlet.

Contact Information
Karen Holmes
California Department of Transportation
50 Higuera Street
San Luis Obispo, CA 93401

Phone : (805) 542-4794

Location

Counties
Santa Barbara
State Highways
SR-101 at Postmile 45.5
Other Location Info
near Gaviota State Park

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California Department of Transportation 50 Higuera Street San Luis Obispo, CA 93401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2018071001_Gaviota Culvert Replacement   PDF 284 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print