Zero Impact Renewable Hydrogen Production Facility (Hydrogen Electrolysis and Steam Methane Reformation Plant, City of Moreno Valley, Riverside County,

Summary

SCH Number
2018069014
Lead Agency
City of Moreno Valley
Document Title
Zero Impact Renewable Hydrogen Production Facility (Hydrogen Electrolysis and Steam Methane Reformation Plant, City of Moreno Valley, Riverside County,
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2018
Document Description
California) (PA07-0035 (Master Plot Plan), PA07-0039 (Plot Plan) and PA08-0021 (Tentative Parcel Map 35822)) Construction and operation of an electrolysis-based hydrogen production plant, with hydrogen storage and transfill station for hydrogen fuel distribution. The facility will have a nameplate production capacity of 5,000 kilograms of hydrogen per day, utilizing grid-tied electricity and municipal water. The facility will produce 100 percent renewable hydrogen fuel and supply it to CA's network of public hydrogen refueling stations for use in fuel cell electric vehicles. On Jan 26, 2010, City of Moreno Valley as lead agency adopted a Negative Declaration for six industrial buildings to be built on six separate parcels under PA07-0035 (Master Plot Plan), PA07-0039 (Plot Plan) and PA08-0021 (Tentative Parcel Map 35822). On May 31, 2018, the City of Moreno Valley prepared an Addendum to the Negative Declaration for the project and both documents are used as the basis for the Energy Commission's approval of the project acting as a responsible agency.

Contact Information

Name
Matthew Ong
Agency Name
CA Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley
Counties
Riverside

Notice of Determination

Approving Agency
CA Energy Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print