Newell Creek Dam Spillway Bridge Replacement Project

Summary

SCH Number
2018068082
Lead Agency
Santa Cruz, City of (City of Santa Cruz)
Document Title
Newell Creek Dam Spillway Bridge Replacement Project
Document Type
NOE - Notice of Exemption
Received

Document Description
The City of Santa Cruz Water Department is proposing to replace an existing single-lane roadway bridge that crosses the Newell Creek Dam spillway within the property of the Loch Lomond Reservoir Facility. The project includes demolition and removal of the existing bridge and the construction of the replacement bridge at the same location. New piers will be drilled into the rock on either side of the spillway crossing to suppirt the new bridge. Newell Creek Road is restricted to authorized vehicles in this area and the spillway bridge crossing provides access onto the crest of Newell Creek Dam and the western property of the Loch Lomond Reservoir Facility.

Contact Information
Heidi Luckenbach
City of Santa Cruz
212 Locust St., Suite C
Santa Cruz, CA 95060

(831) 420-5214

Location

Counties
Santa Cruz
Cross Streets
Newell Creek Road, Ben Lomond, CA
Zip
95018
Waterways
Newell Creek Dam

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 15302
Reasons for Exemption
The project will result in the replacement of an existing single-lane roadway bridge with no change to the function and intended utility of the bridge.The new single-lane concrete bridge will cross the Newell Creek Dam spillway in the same location as the existing bridge.
Download CSV New Search