Water Storage Improvement Project (Project)
2 Documents in Project
Summary
SCH Number
2018062044
Lead Agency
State Water Resources Control Board
Document Title
Water Storage Improvement Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2019
Document Description
The State Water Resourcs Control Board (State Water Board) is the lead agency
for this Project. The State Water Board's Safe Drinking Water State Revolving Fund (SDWSRF) Program is providing funds for the project. The Lassen Pin~s Mutual Water Company proposes to construct a 390,000-gallon water storage tank, replace its well.and booster pumping systems, replace the two existing hydropneumatic tanks (one at 5,000 gallons and one at 10,000 gallons) with a new 500-gallon hydropneumatic tank, construct a 1 0-by-12-foot booster pump building and install associated piping within the boundary of the existing well and water treatment f,acility. The Project also involves upgrading the existing residential distribution system through the installation of approximately 180 new water meters, equipped with an automatic meter reading system, and replacement of the associated valves and piping within the Lake Mccumber subdivision.
Contact Information
Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
State Water Resources Control Board
Contact Types
Project Applicant
Location
Counties
Shasta
Other Location Info
The Lassen Pines Mutual Water Company well and water treatment facility on
Mountain Meadow Road in Shingletown, Shasta County, California, and at residential water meter locations within the public right-of-way of the Lake Mccumber subdivision.
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.