Oroville Hydroelectric Facilities Fiber Optic Upgrade Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018062028
- Lead Agency
- Water Resources, Department of (California Department of Water Resources)
- Document Title
- Oroville Hydroelectric Facilities Fiber Optic Upgrade Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/18/2018
- Present Land Use
- public roadways
- Document Description
- DWR proposes to upgrade the fiber optic cable between the DWR Oroville Field Division Operations and Maintenance Center, the Hyatt Powerplant, and the Thermalito Diversion Dam, DWR must ensure the reliable and permanent transmission of info to manage the Oroville Facilities. As such, the proposed project entails the upgrade of the fiber optic cable to modern standards. The proposed project would involve open trench installation following an existing underground route, approx 2.4 miles long, along Oro Dam Blvd East and Glen Dr from the O&M Center to the junction with the existing fiber optic cable line which connects to the TDD and Hyatt PP. Proposed construction activities include trenching (excavation and fill), line and cable installation, paving, and site restoration.
- Contact Information
-
Gail Kuenster
California Department of Water Resources
3500 Industrial Blvd
Sacramento, CA 95691
Phone : (916) 376-9780
Location
- Coordinates
- 39°31'19.4"N 121°30'31.2"W
- Cities
- Oroville
- Counties
- Butte
- Cross Streets
- Glen Dr and Oro Dam Blvd East
- Zip
- 95966
- Total Acres
- 3.4
- State Highways
- 162
- Waterways
- Thermalito Diversion Pool, Feather River, Lake Oroville
- Township
- 19N
- Range
- 4E
- Section
- 10
Notice of Determination
- Approving Agency
- DWR
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 3500 Industrial Blvd., West Sacramento, CA 95691
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.