Oroville Hydroelectric Facilities Fiber Optic Upgrade Project

2 Documents in Project

Summary

SCH Number
2018062028
Lead Agency
California Department of Water Resources (DWR)
Document Title
Oroville Hydroelectric Facilities Fiber Optic Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2018
Present Land Use
public roadways
Document Description
DWR proposes to upgrade the fiber optic cable between the DWR Oroville Field Division Operations and Maintenance Center, the Hyatt Powerplant, and the Thermalito Diversion Dam, DWR must ensure the reliable and permanent transmission of info to manage the Oroville Facilities. As such, the proposed project entails the upgrade of the fiber optic cable to modern standards. The proposed project would involve open trench installation following an existing underground route, approx 2.4 miles long, along Oro Dam Blvd East and Glen Dr from the O&M Center to the junction with the existing fiber optic cable line which connects to the TDD and Hyatt PP. Proposed construction activities include trenching (excavation and fill), line and cable installation, paving, and site restoration.

Contact Information

Name
Gail Kuenster
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Oroville
Counties
Butte
Cross Streets
Glen Dr and Oro Dam Blvd East
Zip
95966
Total Acres
3.4
State Highways
162
Waterways
Thermalito Diversion Pool, Feather River, Lake Oroville
Township
19N
Range
4E
Section
10

Notice of Determination

Approving Agency
DWR
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.