Oroville Hydroelectric Facilities Fiber Optic Upgrade Project

2 Documents in Project

Summary

SCH Number
2018062028
Lead Agency
Water Resources, Department of (California Department of Water Resources)
Document Title
Oroville Hydroelectric Facilities Fiber Optic Upgrade Project
Document Type
NOD - Notice of Determination
Received

Document Description
DWR proposes to upgrade the fiber optic cable between the DWR Oroville Field Division Operations and Maintenance Center, the Hyatt Powerplant, and the Thermalito Diversion Dam, DWR must ensure the reliable and permanent transmission of info to manage the Oroville Facilities. As such, the proposed project entails the upgrade of the fiber optic cable to modern standards. The proposed project would involve open trench installation following an existing underground route, approx 2.4 miles long, along Oro Dam Blvd East and Glen Dr from the O&M Center to the junction with the existing fiber optic cable line which connects to the TDD and Hyatt PP. Proposed construction activities include trenching (excavation and fill), line and cable installation, paving, and site restoration.

Contact Information
Gail Kuenster
California Department of Water Resources
3500 Industrial Blvd
Sacramento, CA 95691

916-376-9780

Location

Coordinates
39°31'19.4"N 121°30'31.2"W
Cities
Oroville
Counties
Butte
Cross Streets
Glen Dr and Oro Dam Blvd East
Zip
95966
Total Acres
3.4
State Highways
162
Waterways
Thermalito Diversion Pool, Feather River, Lake Oroville
Township
19N
Range
4E
Section
10

Notice of Determination

Approving Agency
DWR
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
3500 Industrial Blvd., West Sacramento, CA 95691

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search