Kaiser Pond Diversion Pipe Improvement Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018062015
- Lead Agency
- Alameda County Water District (ACWD)
- Document Title
- Kaiser Pond Diversion Pipe Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/21/2018
- Present Land Use
- recharge basins
- Document Description
- ACWD proposes to restore the hydraulic connectivity between two recharge basins, the Above Hayward Fault and the Below Hayward Fault ponds, by replacing the existing diversion pipe with a reinforced concrete box culvert and spillway. The ponds are separated by an unengineered levee that is a remnant of past quarry operations. As part of the proposed project, the district would also repair existing erosion damage on the surface of the levee resulting from the failure of the existinf diversion pipe.
- Contact Information
-
Carlos Sempere
Alameda County Water District
Lead/Public Agency
43885 S. Grimmer Boulevard
Fremont, CA 94537
Phone : (510) 688-4484
Location
- Coordinates
- 37°34'9.28"N 121°59'1.82"W
- Cities
- Fremont
- Counties
- Alameda
- Cross Streets
- Shinn St & Von Euw Common
- Zip
- 94536
- Total Acres
- 0.12
- Parcel #
- 507 037700102
- State Highways
- 84, 238
- Railways
- UPRR, BART
- Schools
- Niles, Parkmont, Vallejo
- Waterways
- Alameda Creek
Notice of Determination
- Approving Agency
- Alameda County Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 43885 South Grimmer Blvd., Fremont, CA 94538
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.