Freeport Septic Conversion Project

2 Documents in Project

Summary

SCH Number
2018062004
Lead Agency
Sacramento County
Document Title
Freeport Septic Conversion Project
Document Type
NOD - Notice of Determination
Received

Document Description
Teh Freeport Septic Conversion Project would bring public seweer services to the town of Freeport. The project elements include installation of a 3" forcemain sewer line to allow for service to the 41 parcels in the town of Freeport, as well as the decommissioning and installation of private connections to those properties wishing to participate at the time of construction. A new Sacramento Area Sewer District force main sewer line would be constructed from the south end of the town of Freeport near Bartley Cavanaugh golf course, extend north along Freeport Blvd past Consumnes River Blvd then east follwoing the existing Regional San Lower Northwest Interceptor alignment and connect to an existing manhole on the southeast corner of the Verizon property. Sewer flows would consist of approximately 0.1 million gallons per day of waste, and discharge into a 10-inch sewer pipe owned by the City of Sacramento near Interstate 5. This City pipe connect to a Regional San Interceptor that discharges into the Sacramento Regional Wastewater Treatment Plant, where it is treated and ultimately discharges into the Sacramento River.

Contact Information
Tim Hawkins
Sacramento County
827 Seventh Street, Room 225
Sacramento, CA 95814

(916) 874-6141

Location

Coordinates
38°27'52.83"N 121°30'09.95"W
Cities
Sacramento
Counties
Sacramento
Cross Streets
Freeport Blvd/Consumnes River Blvd
Zip
95832
Parcel #
Various
State Highways
5
Railways
Union Pacific, Sacramento Southe
Airports
Borges-Clarksburg
Waterways
Sacramento River
Township
7N
Range
4E
Section
11-14

Notice of Determination

Approving Agency
Sacramento County Regional Sanitation District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No