Sequoia Investments X LLC Fairhaven Business Park CDP/CUP
2 Documents in Project
Summary
SCH Number
2018062001
Lead Agency
Humboldt County
Document Title
Sequoia Investments X LLC Fairhaven Business Park CDP/CUP
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2018
Present Land Use
Industrial/ Coastal Dependent Industrial/
Document Description
A Costal Development Permit and Conditional Use Permit to allow non-coastal dependent industrial interim uses for a maximum permit term of seven (7) years within existing facilities, as defined Chapter 3, Section 313-3.4 of the Humboldt County Zoning Code. The existing facilities were formerly the site of the Simpson Pulp Mill, which operated from 1955 to 1993. All existing on-site infrastructure, including storage and distribution warehouses, processing and industrial equipment, administrative buildings, employee facilities, paved and unpaved lease areas, and roads were developed during this time. At the height of operations, the pulp mill processed nearly 1,000 tons of paper pulp per day and employed close to 300 people. The facilities vacated by Simpson are located in the Coastal Dependent Industrial zone and are now proposed to be permitted for interim uses. Proposed interim uses will be required to meet the performance standards outlined in HCC Chapter 3. Interim uses will be required to meet the performance standards outlined in HCC Chapter 3.
Contact Information
Name
Michael Wheeler
Agency Name
Humboldt County
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Humboldt
Cross Streets
New Navy Base Road and Bendixen Street
Zip
95502
Total Acres
27
Parcel #
401-301-016--000, 401-311-001-000
State Highways
255
Airports
Eureka Municipal
Schools
Samoa School
Waterways
Humboldt Bay
Township
05N
Range
01W
Section
28-29
Base
HBM
Notice of Determination
Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.