Second Addendum to the Permit Renewal for So. Cal. Ship Services Final Initial Study and Mitigated Negative Declaration

4 Documents in Project

Summary

SCH Number
2018061043
Lead Agency
Port of Los Angeles
Document Title
Second Addendum to the Permit Renewal for So. Cal. Ship Services Final Initial Study and Mitigated Negative Declaration
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2022
Document Description
The Revised Proposed Project clarifies a minor modification to the footprint that will not result in any additional square footage nor a change in proposed use. This minor boundary adjustment would allow parking of passenger vehicles on an existing paved surface. The existing use of the boundary adjustment area is for parking of passenger vehicles. As such, there will be no change in use.

Contact Information

Name
Nicole Enciso
Agency Name
City of Los Angeles - Harbor Department
Job Title
Marine Environmental Supervisor
Contact Types
Lead/Public Agency

Location

Cities
San Pedro
Counties
Los Angeles
Regions
Southern California
Zip
90731
Total Acres
92
Waterways
POLA Main Channel (east of project site)
Other Location Info
971 South Seaside Avenue, San Pedro, CA 90731

Notice of Determination

Approving Agency
City of Los Angeles - Harbor Department
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.portoflosangeles.org/environment/ceqa

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Initial Study/Mitigated Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print