13100 Brooks Drive Digital Billboard
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018061041
- Lead Agency
- City of Baldwin Park
- Document Title
- 13100 Brooks Drive Digital Billboard
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/10/2018
- Present Land Use
- GP: General industrial; Z: I
- Document Description
- The project is located on a 1.38-acre developed property located at 13100 Brooks Dr in the northwest portion of the city of Baldwin Park. The project proposes to construct and operate a 67.5-ft tall, dual faced, digital/LED billboard with associated infrastructure connections. Project operation would include the displaying of alternating LED advertisements on either side of the billboard and periodic maintenance of the billboard. The project does not propose to alter the existing on-site commercial building. The project's discretionary actions include a development agreement with the City of Baldin Park and Caltrans outdoors advertsising display permit.
- Contact Information
-
Abraham Tellez
City of Baldwin Park
Lead/Public Agency
14403 E. Pacific Avenue
Baldwin Park, CA 91706
Phone : 626-960-4011 x456
Location
- Coordinates
- 34°05'57"N 117°59'02"W
- Cities
- Baldwin Park
- Counties
- Los Angeles
- Cross Streets
- 13100 Brooks Dr
- Zip
- 91706
- Total Acres
- 1.38
- Parcel #
- 8535-023-086
- State Highways
- I-605, 10
- Schools
- Walnut ES; Olive MS
- Waterways
- San Gabriel River
- Township
- 1S
- Range
- 11W
- Section
- 19
Notice of Determination
- Approving Agency
- City of Baldwin Park
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 14403 East Pacific Ave, Baldwin Park, CA 91706
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.