D-1240C (ID-465G-3) Natural Gas Pipeline 300A Dig Project, MP 101.15
5 Documents in Project
Summary
SCH Number
2018061004
Lead Agency
California Department of Fish and Wildlife, Inland Deserts Region 6
(CDFW)
Document Title
D-1240C (ID-465G-3) Natural Gas Pipeline 300A Dig Project, MP 101.15
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2021
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration, EPIMS Notification No. SBR-18068-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Pacific Gas and Electric Company.
The project is limited to excavation of one 8-foot by 8-foot pothole and a portion of one 9-foot by 12-foot by 10-foot
bell hole within the dry wash for pipeline inspection and repair activities. Site preparation will include erection of
ERTEC biological fencing around the perimeter of the work site. Fencing will be installed by excavating a 6-inch
wide by 6-inch-deep trench, placing the fencing in the trench, and backfilling to support the fence placement.
Excavation of the 8-foot by 8-foot pothole and the 9-foot by 12-foot by 10-foot bell hole within the dry wash will
require temporary shoring.
Contact Information
Name
Ashley Rosales
Agency Name
Fish and Wildlife, Region 6
Contact Types
Responsible Agency
Phone
Location
Notice of Determination
Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
Department Of Fish and Wildlife
Inland Deserts Region
3602 Inland Empire Blvd., Suite C-220
Ontario, Ca. 91764
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.