Distribution Systems Improvements Project
5 Documents in Project
Summary
SCH Number
2018052058
Lead Agency
Reclamation District 108
(RD108)
Document Title
Distribution Systems Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2018
Present Land Use
ag intensive
Document Description
The proposed project consists of replacing 27 existing manually operated gates with remotely operated and monitored gates, which would use SCADA controls. The District also proposes the installation of three underground irrigation water pipelines totaling approx 2.6 miles in length, and to abandon an existing unscreened point of diversion along the Sacramento River. The proposed project would have multiple benefits, including allowing the District to decrease diversions from the Sacramento River by up to approx 2,587 acre-feet per year, reducing energy use as a result of the reduced pumping that would be facilitated by replacement of the manual gates and installation of the new pipelines, and improving conditions for the federally endangered winter-run salmon in the Sacramento River by abandoning the unscreened point of diversion.
Contact Information
Name
William Vanderwaal
Agency Name
Reclamation District 108
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Colusa, Yolo
Cross Streets
Yolo County Line Rd and SR 45
Zip
95957
Total Acres
21.25
Parcel #
053-030-01
State Highways
SR 45
Waterways
Sacramento River, Colusa Basin Drain
Township
12N
Range
1E
Section
3
Other Location Info
Knights Landing
Notice of Determination
Approving Agency
Reclamation District 108
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.