Ebbetts Pass Reach 1 Water Transmission Pipeline Capital Improvement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018052042
- Lead Agency
- Calaveras County Water District (CCWD)
- Document Title
- Ebbetts Pass Reach 1 Water Transmission Pipeline Capital Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/2/2018
- Present Land Use
- ROW, GF
- Document Description
- The Calaveras County Water District is proposing approx 24,500 lf of new water pipeline, hydrants, blow-off valves, and main line valves to replace existing facilities constructed in 1965. Except for a +/-1,080 ft long section of pipeline near the Hunter Dam WTP, the existing Ebbetts Pass Reach 1 pipeline is located within Caltrans SR-4 ROW. The alignment is from approx PM 32.3 (West of Forest Meadow) to PM 37.0 (near Hunter Dam Rd, just west of Avery, CA). The replacement pipeline will also be placed within the SR 4 ROW and constructed as close as practical to the existing pipeline, which is primarily located past edge of pavement within the south shoulder.
- Contact Information
-
Charles Palmer
Calaveras County Water District
Lead/Public Agency
120 Toma Court
San Andreas, CA 95249
Phone : (209) 754-3174
charlesp@ccwd.org
Location
- Counties
- Calaveras
- Zip
- 95249
- Total Acres
- 4.5 linear mi
- State Highways
- Hwy 4
- Waterways
- Mill Creek
- Other Location Info
- Forest Meadows
Notice of Determination
- Approving Agency
- Calaveras County Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 120 Toma Court, San Andreas, CA 95249
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.