Uvas Creek Levee Rehabilitation Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018052025
- Lead Agency
- Santa Clara Valley Water District
- Document Title
- Uvas Creek Levee Rehabilitation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/17/2018
- Present Land Use
- open space/park public facility/neighborhood district
- Document Description
- Project would consist of inboard and outboard side slope reconstruction along approx. 4,200 linear feet of the levee. An additional 350 linear feet of reconstruction would occur to the outboard embankment. The levee side slope reconstruction would first require knowing the existing grasses to reduce the organic content followed by excavation and benching of the levee. Upon completion of the excavation activities, rebuilding the levee would consist of placing the excavated material in compacted layers. Erosion control matting would be embedded within the rebuilt levee slope and covered with additional fill material until as-built grades are achieved. The rebuilt levee surface would be hydroseeded with a native seed to promote the establishment of grasses. Resurfacing of the existing asphalt pedestrian trail and maintenance road atop the levee would be undertaken to repair damage, if any, from construction equipment.
- Contact Information
-
Tim Tidwell
Santa Clara Valley Water District
Lead/Public Agency
5750 Almaden Expressway
San Jose, CA 95818
Phone : (408) 630-3003
Location
- Coordinates
- 36°59'33.1"N 121°34'28.9"W
- Cities
- Gilroy
- Counties
- Santa Clara
- Cross Streets
- West Luchessa Ave and Princevalle St
- Zip
- 95020
- Total Acres
- 11
- State Highways
- 101, 152
- Railways
- Caltrain
- Waterways
- Uvas Creek, Princevalle Drain
- Township
- 11S
- Range
- 4E
- Section
- 7
- Base
- MD
Notice of Determination
- Approving Agency
- Santa Clara Valley Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 5750 Almaden Expressway, San Jose, CA 95118
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.