Rehabilitate Whitewater River Bridges Project (EA 08-1E570)

3 Documents in Project

Summary

SCH Number
2018051054
Lead Agency
Caltrans 8 (San Bernardino) (California Department of Transportation, District 8)
Document Title
Rehabilitate Whitewater River Bridges Project (EA 08-1E570)
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2018

Document Description
The project would rehabilitate the Whitewater River Bridges (No. 56-004L and 5-004L and 56-004R) located on I-10 between Tipton Road and Kellogg Road, 10 miles west of the City of Palm Springs, at PM 27.69. The project would strengthen existing bridge footings by adding piles, pile caps, and permanent grouted Rock Slope Protection around the existing Whitewater Bridge footings. All work will be performed within the State ROW and within project limits. The project requires Temporary Construction Easements to accommodate construction access. No permanent rights of way would be required. All construction would be performed off the I-10 freeway and under the bridge.

Contact Information
Renetta Cloud
California Department of Transportation, District 8
464 W. 4th Street, 6th Floor
San Bernardino, CA 92401-1400

Phone : (909) 383-6323

Location

Coordinates
°59'46"N 33°'"W
Cities
Palm Springs
Counties
Riverside
Cross Streets
I-10 between Tipton Rd and Kellogg Rd at PM 27.69
State Highways
I-10
Waterways
Whitewater River
Township
3S
Range
3E
Section
11

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
464 West 4th St., San Bernardino, CA 92401-1400

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No