Addendum No. 2 to the Regional Water Reclamation Facility Upgrade and Expansion Project
10 Documents in Project
Summary
SCH Number
2018051053
Lead Agency
Elsinore Valley Municipal Water District
Document Title
Addendum No. 2 to the Regional Water Reclamation Facility Upgrade and Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2023
Document Description
The proposed project component addressed in the Second Addendum to the MND consists of the temporary installation and use of construction trailers at a site adjacent to the RWRF, including minor site grading, installation of the trailers, utility and communications lines connections, and chain link fencing. Following construction of the RWRF expansion, the trailers, utility and communications connections, and fencing would be removed. The MND being addended addressed EVMWD’s proposal to expand its RWRF from an existing capacity of 8 million gallons per day (MGD) to 12 MGD. An NOD for the proposed project was filed with the State Clearinghouse on July 31, 2018. The first Addendum to the MND addressed additional construction staging and laydown areas; an NOD for that first Addendum was filed with the State Clearinghouse on April 5, 2022.
Contact Information
Name
Nelson Nuezca
Agency Name
Elsinore Valley Municipal Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Lake Elsinore
Counties
Riverside
Regions
Citywide
Cross Streets
Strickland Avenue
Zip
92530
Other Location Info
EVMWD’s RWRF is located at 31315 Chaney Street in the City of Lake Elsinore, approximately 0.5 mile northeast of Lake Elsinore. The proposed construction trailers site addressed in the Second Addendum to the MND is located between the RWRF and Strickland Avenue, encompassing Assessor’s Parcel Numbers 375-291-007 through 375-291-015 (Coordinates 33.685472°N, 117.346197°W).
Notice of Determination
Approving Agency
Elsinore Valley Municipal Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
https://evmwd.com/ceqa-information/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.