Cardiff School Modernization and Reconstruction Project

4 Documents in Project

Summary

SCH Number
2018051016
Lead Agency
Cardiff School District
Document Title
Cardiff School Modernization and Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
2/8/2019
Present Land Use
GP LU: Public/semi public; Z: Public/semi public and coastal bluff overlay zone
Document Description
The proposed project entails demolition of five 1-story buildings, a portion of another building, and eight relocatable classrooms; construction of ten 1-story wood-framed buildings and a 2-classroom addition to an existing building; and modernization of two existing buildings. The project would increase the school's building area by 5,289 net sf, including one new classroom and one specialty lab. The project would increase the total number of classrooms from 19 to 20 and increase the capacity of the school by 22 seats. The project would also enhance onsite passenger loading and parking; relocation of play structures; and replacement of existing baseball field with two natural turf soccer fields. Additionally, development of the proposed school buildings would encroach into the 6(f)(3) boundary and require approval of a minor boundary change to the 6(f)(3) area by the National Park Service. Construction would commence summer 2019 and be completed in 19 months.

Contact Information

Name
Randy Peterson
Agency Name
Cardiff School District
Contact Types
Lead/Public Agency

Location

Cities
Encinitas
Counties
San Diego
Cross Streets
San Elijo Ave, Montgomery Ave, Mozart Ave
Zip
92007
Total Acres
7.4
Parcel #
260-3400-100, -200
State Highways
S. Coast Hwy 101, I-5
Railways
NCTD Coaster, Amtrak
Schools
Ada Harris School, Learn
Waterways
Pacific Ocean, San Elijo Lagoon
Township
13S
Range
4W
Section
22
Other Location Info
1888 Montgomery Ave, Cardiff, CA 92007

Notice of Determination

Approving Agency
Cardiff School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print