Tumey Gulch Bridge Replacement Project

4 Documents in Project

Summary

SCH Number
2018051001
Lead Agency
Caltrans 6 (Fresno) (California Department of Transportation, District 6)
Document Title
Tumey Gulch Bridge Replacement Project
Document Type
FIN - Final Document
Received
Present Land Use
transportation facility

Document Description
Caltrans proposes to replace the existing Tumey Gulch Bridge (42-0246L and 42-0246R), on I-5 in Fresno County just south of Manning Ave, with new bridges. The project limits run from post miles 44.4-45.4. The purpose of the project is to address deficiencies of the existing Tumey Gulch bridges by replacing them with new bridges of a different design. The existing bridges have a history of approach settlement and movement of abutments. This project proposes one build alternative with two bridge design options: design option 1 (two single span, 100-ft long bridges) or design option 2 (two three-span, 140-ft long bridges). No acquisition of ROW is expected to be needed to construct this project, and no temporary construction easements are planned.

Contact Information
Richard Putler
California Department of Transportation, District 6
855 M St, Suite 200
Fresno, CA 93721

Phone : (559) 445-5286

Location

Counties
Fresno
Cross Streets
Hudson Ave and Manning Ave
Zip
93640
State Highways
5
Waterways
Tumey Gulch

Notice of Completion

Development Type
Other (replace existing bridges on transportation facility)
Project Issues
Flood Plain/Flooding Toxic/Hazardous Water Quality Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print