Tumey Gulch Bridge Replacement Project

7 Documents in Project

Summary

SCH Number
2018051001
Lead Agency
California Department of Transportation, District 6
Document Title
Tumey Gulch Bridge Replacement Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
transportation facility
Document Description
Caltrans proposes to replace the existing Tumey Gulch Bridge (42-0246L and 42-0246R), on I-5 in Fresno County just south of Manning Ave, with new bridges. The project limits run from post miles 44.4-45.4. The purpose of the project is to address deficiencies of the existing Tumey Gulch bridges by replacing them with new bridges of a different design. The existing bridges have a history of approach settlement and movement of abutments. This project proposes one build alternative with two bridge design options: design option 1 (two single span, 100-ft long bridges) or design option 2 (two three-span, 140-ft long bridges). No acquisition of ROW is expected to be needed to construct this project, and no temporary construction easements are planned.

Contact Information

Name
Richard Putler
Agency Name
California Department of Transportation, District 6
Contact Types
Lead/Public Agency

Location

Counties
Fresno
Cross Streets
Hudson Ave and Manning Ave
Zip
93640
State Highways
5
Waterways
Tumey Gulch

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Department of Water Resources, Office of Emergency Services, California, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Department of Fish and Wildlife, Central Region 4 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Central Region 4 (CDFW)
Development Types
Other (replace existing bridges on transportation facility)
Project Issues
Biological Resources, Flood Plain/Flooding, Hazards & Hazardous Materials, Hydrology/Water Quality, Wetland/Riparian