Barker Slough Pumping Plant Grading and Ramp Maintenance

Summary

SCH Number
2018048383
Public Agency
California Department of Water Resources (DWR)
Document Title
Barker Slough Pumping Plant Grading and Ramp Maintenance
Document Type
NOE - Notice of Exemption
Received
Posted
4/18/2018
Document Description
DFD staff will grad eth levee intake road from Hastings Road to BSPP. The material resulting from the grading will be pulled from the sides of the road back onto the road surface. This will remove the washboards from the road surface. The road is approx. 3,230 feet long and 30 feet wide and the area to be graded is approx. 2 acres in size. Additionally, DFD staff will perform maintenance work at the ramp located 200 feet to the west of the southern portion of the levee intake road. The ramp is approx. 20 feet wide by 75 feet long. A four to six inch layer of 3/4 inch aggregate base (AB) will be applied as needed to specific potholes that have occurred since the original ramp repairs. AB will be applied as needed to specific potholes that have occurred since the original ramp repairs. AB will be obtained from the North Bay Maintenance Subcenter located off of Cement Hill Road. Equipment staging will be at BSPP. The entire project is within DWR right of way.

Contact Information

Name
Jerry Snow
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Rio Vista
Counties
Solano

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301, Class 1
Reasons for Exemption
Existing Facilities.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print