Port of Long Beach Microgrid - Resilience for Critical Facilities

Summary

SCH Number
2018048257
Public Agency
California Energy Commission
Document Title
Port of Long Beach Microgrid - Resilience for Critical Facilities
Document Type
NOE - Notice of Exemption
Received
Posted
4/11/2018
Document Description
Project will consist of the installation of a solar carport over a parking lot, installation of an Energy Control Center (including microgrid controller), a stationary battery energy storage system (BESS) and a mobile battery energy storage system, which will be minor structures accessories to the existing Joint Command and Control Center. The Mobile BESS will primarily be connected to the Energy Control Center during normal, grid-connected periods. In the event of grid outages, the mobile BESS will be deployed to stormwater pump stations or refrigerated container yards.

Contact Information

Name
Kenneth Schumann
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15303,15306,21080.35 Class 3,6
Reasons for Exemption
New Construction or Conversion. Information Collection.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print