Samoa Peninsula Wastewater Project Notice of Determination

7 Documents in Project

Summary

SCH Number
2018042083
Lead Agency
Humboldt County
Document Title
Samoa Peninsula Wastewater Project Notice of Determination
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2020
Present Land Use
Industrial, Residential, Natural Resources, Public Facilities
Document Description
1) Initiate amendments to the Humboldt Bay Area Plan (HBAP) to allow the extension of wastewater service outside the Urban Limit Line for existing structures served by on site wastewater systems (OWTS) and to allow the treatment of wastewater from outside the Samoa Town Master Plan (STMP) Overlay Area to be treated at the STMP Wastewater Treatment Plant; and to apply performance standards to new infill development in Fairhaven to address hazards relating to sea level rise and tsunami inundation and to protect ESHA; and (2) to construct 23,100 feet of pressure and gravity sewer mains, laterals to existing structures served by on site wastewater systems, an approx. 0.25 acre expansion of the STMP Wastewater Treatment Plant (including treatment, disinfection, and solids removal), and to discharge treated effluent using the Humboldt Bay Harbor District Ocean Outfall; and (3) to complete comprehensive planning that will result in future amendments to the HBAP to address exposure to sea level rise and tsunami hazards and ESHA protection in the area.

Contact Information

Name
John Miller
Agency Name
County of Humboldt Planning and Building
Contact Types
Lead/Public Agency

Name
Agency Name
County of Humboldt
Contact Types
Project Applicant

Location

Cities
none
Counties
Humboldt
Regions
Northern California
Cross Streets
New Navy Base Road and Bay Street
Zip
95564
Total Acres
N/A
Parcel #
Varous
State Highways
SR 255
Railways
NCRA
Airports
Samoa Field
Schools
Peninsula Union
Waterways
Humboldt Bay
Township
5 N
Range
1 W
Section
20
Base
Humboldt
Other Location Info
Samoa Peninsula

Notice of Determination

Approving Agency
County of Humboldt Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print