Central Reservoir Replacement Project
4 Documents in Project
Summary
SCH Number
2018042078
Lead Agency
East Bay Municipal Utility District
(EBMUD)
Document Title
Central Reservoir Replacement Project
Document Type
FIN - Final Document
Received
Document Description
The East Bay Municipal Utility District (EBMUD), as the California Environmental Quality Act (CEQA) lead agency, prepared a Draft Environmental Impact Report (Draft EIR) for the Central Reservoir Replacement Project (Project). The Draft EIR was developed to provide the public and responsible and trustee agencies reviewing the Project with an analysis of the potential effects on the local and regional environment associated with construction and operation of the Project. Central Reservoir is a 154-million-gallon (MG) open-cut reservoir that was constructed in 1910. The Project includes removal of vegetation and demolition of the existing reservoir, roof, lining, and material storage building, followed by removal of a portion of the reservoir’s main embankment and construction of a reinforced tank foundation system, three 17-MG concrete tanks, a new rate control station, a valve structure, service road and site paving, a bioretention area, and security fencing all within the existing reservoir property. The Project site design, with community input, incorporates existing landscaping and a mix of earthen berms, trees, and shrubs to screen the tanks and emphasize the natural setting at the perimeter of the site while balancing earthwork. The Project may also include an access driveway to connect the Redwood Day School parking area to Ardley Avenue.
Contact Information
Name
Aaron Hope
Agency Name
EBMUD
Contact Types
Lead/Public Agency
Address
Phone
Email
Location
Cities
Oakland
Counties
Alameda
Cross Streets
37.79765, -122.22353
Notice of Completion
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water
Development Types
Water Facilities (Replace 154 MG reservoir with three 17 MG concrete tanks)(Type Reservoir, MGD 50)
Local Actions
Reservoir Replacement
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Energy, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Mandatory Findings of Significance, Noise, Recreation
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.