Narrows 2 Large Woody Material Mitigation Project (Lake or Streambed Alteration Agreement No. 1600-2018-0003-R2)

6 Documents in Project

Summary

SCH Number
2018042077
Lead Agency
Yuba County Water Agency
Document Title
Narrows 2 Large Woody Material Mitigation Project (Lake or Streambed Alteration Agreement No. 1600-2018-0003-R2)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0003-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Yuba County Water Agency. The Narrows 2 Large Moody Material Mitigation Project includes placement of a total of 30 pieces of large woody material (LWM) distributed evenly at three locations (10 pieces of LWM per site) within the lower Yuba River. The three placement locations include: Sites 1 and 2 at approx. RM 20.3 and 20.0 on the north bank of the river near the University of California's Sierra Foothill Research and Extension Center Educational Pavilion, and Site 3 at RM 18.1 on the north bank of the river near the State Hwy 20 Bridge crossing. At each site, 10 pieces of LWM will be placed, consisting of: 7 logs with attached root wads with a target size of 18 feet or greater in length, with an average diameter of 24 inches or greater, and 3 smaller logs with attached crowns with a minimum thickness of 10 inches in diameter at breast height.

Contact Information
Sean Hoobler
CDFW
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

916-358-4359

Location

Counties
Yuba
Zip
95918
Total Acres
71
Parcel #
005-290-005-000, -008-000
State Highways
20
Waterways
Yuba River
Other Location Info
Smartsville

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search