Narrows 2 Large Woody Material Mitigation Project (Lake or Streambed Alteration Agreement No. 1600-2018-0003-R2)
6 Documents in Project
Summary
SCH Number
2018042077
Lead Agency
Yuba County Water Agency
Document Title
Narrows 2 Large Woody Material Mitigation Project (Lake or Streambed Alteration Agreement No. 1600-2018-0003-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/10/2018
Present Land Use
RR District-5 acres and small portion of residential estate district
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0003-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Yuba County Water Agency.
The Narrows 2 Large Moody Material Mitigation Project includes placement of a total of 30 pieces of large woody material (LWM) distributed evenly at three locations (10 pieces of LWM per site) within the lower Yuba River. The three placement locations include: Sites 1 and 2 at approx. RM 20.3 and 20.0 on the north bank of the river near the University of California's Sierra Foothill Research and Extension Center Educational Pavilion, and Site 3 at RM 18.1 on the north bank of the river near the State Hwy 20 Bridge crossing. At each site, 10 pieces of LWM will be placed, consisting of: 7 logs with attached root wads with a target size of 18 feet or greater in length, with an average diameter of 24 inches or greater, and 3 smaller logs with attached crowns with a minimum thickness of 10 inches in diameter at breast height.
Contact Information
Name
Sean Hoobler
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Yuba
Zip
95918
Total Acres
71
Parcel #
005-290-005-000, -008-000
State Highways
20
Waterways
Yuba River
Other Location Info
Smartsville
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.