Narrows 2 Mitigation

6 Documents in Project

Summary

SCH Number
2018042077
Lead Agency
Yuba County Water Agency
Document Title
Narrows 2 Mitigation
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2018
Present Land Use
RR District-5 acres and small portion of residential estate district
Document Description
The proposed work is located on the UC and private lands in Yuba County. YCWA would place LWM pieces in the Yuba River downstream of Englebright Dam at 3 locations: 1) at RM 20.3 near the UC's Sierra Foothill Research and Extension Center; 2) at about RM 20.0; and 3) at RM 18.1 near the hwy 20 bridge crossing. YCWA would acquire LWM from local sources and have them trucked to the sites. YCWA will place each piece downstream facing at approx a 45- degree angle to the stream bank with approx one-half of the LWM piece buried in the bank with the root wad exposed. The backhoe, located on dry ground, will be used to excavate the bank where the LWM piece will be placed. The excavated fill will be placed over the LWM piece. The proposed work would also include monitoring pre and post the placement of LWM.

Contact Information

Name
Tim Truong
Agency Name
Yuba County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Yuba
Zip
95918
Total Acres
71
Parcel #
005-290-005-000, -008-000
State Highways
20
Waterways
Yuba River
Other Location Info
Smartsville

Notice of Determination

Approving Agency
Yuba County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes