South Fork Mokelumne River Watershed Restoration - Phase 3 Treatment (SNC #1067)

3 Documents in Project

Summary

SCH Number
2018042049
Lead Agency
Sierra Nevada Conservancy
Document Title
South Fork Mokelumne River Watershed Restoration - Phase 3 Treatment (SNC #1067)
Document Type
NOD - Notice of Determination
Received

Document Description
SNC would provide $865,835 in funding to treat surface and ladder fuels on 285 acres of forested land administered by the Bureau Land Management within the South Fork Mokelumne River watershed. Project objective are to enhance watershed health, reduce the risk of wildfire ignition and spread, reduce erosion hazard, protect water quality, and increase forest ecological resilience overall. Treatments associated with the project would include mechanical mastication and hand thinning, as well as chipping and pile burning.

Contact Information
Shannon Ciotti
Sierra Nevada Conservancy
11521 Blocker Drive, Suite 205
Aurburn, CA 95603

5308234689

Location

Counties
Calaveras
Other Location Info
Sandy Gulch, Wilseyville, and Railroad Flat

Notice of Determination

Approving Agency
Sierra Nevada Conservancy
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
11521 Blocker Drive, Suite 205, Auburn, CA 95603

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018042049   PDF 801 K
Download CSV New Search