East Rio Bonito Road Bridge Replacement Project at Hamilton Slough and Sutter Butte Canal

2 Documents in Project

Summary

SCH Number
2018042044
Lead Agency
Butte County
Document Title
East Rio Bonito Road Bridge Replacement Project at Hamilton Slough and Sutter Butte Canal
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project would replace the existing bridges along East Rio Bonito over Hamilton Slough and Sutter Butte Canal with cast-in-place pre-stressed, post tentioned concrete slab bridge. The Hamilton Slough bridge will be a 50-ft long two span bridge and the Sutter Butte Canal bridge will be a 75-ft single span bridge. The project will also be realigning the roadway, eliminating sharp corners and bringing the roadway to a 35 mph standard.

Contact Information
Raymond Cooper
Butte County
7 County Center Drive
Oroville, CA 95965

(530) 538-7681

Location

Coordinates
39°25'30.5"N 121°40'50.6"W
Cities
Biggs
Counties
Butte
Cross Streets
East Rio Bonito Rd at Hwy 99
Zip
95917
Total Acres
315
Parcel #
025-300-017-000
State Highways
99
Railways
UPRR
Schools
Biggs HS
Waterways
Hamilton Slough and Sutter Butte Canal
Township
18N
Range
3E
Section
7
Base
MD

Notice of Determination

Approving Agency
Butte County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
7 County Center Dr., Oroville, CA 95965

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search