Flumes 38, 39/40, 44, and Canal Replacement Project

3 Documents in Project

Summary

SCH Number
2018042021
Lead Agency
El Dorado Irrigation District
Document Title
Flumes 38, 39/40, 44, and Canal Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2018
Present Land Use
Natural resources/residential ag, tpz
Document Description
Project involves the replacement of Flumes 38, 39/40, and 44 and associated canal segments and appurtenances. The project includes applying air-placed concrete to the existing segments of the Canal and conversion of wooden flume structures to pre-cast or air-placed concrete canal or box culvert. The project also involves improvements to the existing Canal bench, which currently provides only limited access for construction and maintenance activities. The project would result in no change in Canal operations or capacity. The project is designed to protect public safety and prevent resource damage by ensuring the continued operational reliability of the Canal system to safely provide water for drinking water for hydroelectric generation.

Contact Information

Name
Brian Deason
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
US 50
Zip
95726
Total Acres
26
Parcel #
011-110-18, 25, 31, 32
State Highways
50
Waterways
South Fork American River
Township
11N
Range
14E
Section
30,31,
Base
Riverton
Other Location Info
Pollock Pines

Notice of Determination

Approving Agency
El Dorado Irrigaiton District
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print