505 San Pedro Avenue Project

2 Documents in Project

Summary

SCH Number
2018042010
Lead Agency
City of Pacifica
Document Title
505 San Pedro Avenue Project
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2018
Present Land Use
various
Document Description
The 505 San Pedro Avenue Project would consist of the demolition of an existing unlawful half-pipe structure and construction of three buildings and associated improvements as follows: Building 31 - a two-story surf shop building for retail sales, surfboard rentals. lockers, and office/storage space with a storage basement and outdoor shower; Building #2 - two story building for storage and surfboard shaping attached to a covered skate park enclosed by a chain link fence; Building #3 - a two-story mixed-use building with retail space and office/storage on the ground floor and two residential units on the second story; Off-street parking area for 24 uncovered car spaces and two garage spaced on the first floor of Building #3 for the residential units above with the request for a reduction in off-street parking and covered parking requirements; and removal of two heritage trees. Implementation of the project would require discretionary approval of a Site development Permit, Coastal Development Permit, Use Permit, and Parking Exception. In addition, two residential development allocations must be approved by City Council prior to issuance of a building permit.

Contact Information

Name
Christian Murdock
Agency Name
City of Pacifica
Contact Types
Lead/Public Agency

Location

Cities
Pacifica
Counties
San Mateo
Cross Streets
505 San Pedro Ave
Zip
94044
Total Acres
0.86
Parcel #
023-072-010
State Highways
1
Schools
Linda Mar School
Waterways
San Pedro Creek and Pacific Ocean
Township
3S
Range
5W
Section
27
Base
MDBM

Notice of Determination

Approving Agency
City of Pacifica
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print