California Institution for Women Solar Project

2 Documents in Project

Summary

SCH Number
2018041038
Lead Agency
General Services, Department of (Department of General Services)
Document Title
California Institution for Women Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2018
Present Land Use
public facility

Document Description
The project would install and operate a 1.05-MWac solar PV power plant within a 9.6-acre undeveloped area that is part of the Chino Institution for Women. The energy generated onsite would be directly supplied to the power grid by an interconnection with the Southern CA Edison system at the southern boundary of the site. Project features include installation of single-axis trackers, installation of arrays providing approx 4,028 solar panels, grid-interactive inverters, underground conduits, and associated electrical equipment. The array field would be surrounded by 8-ft high chain link fence with a 20-ft wide access gate and separated into two areas by a 15-ft wide compacted native earth or aggregate access road.

Contact Information
Terry Ash
Department of General Services
707 Third Street MS#509
West Sacramento, CA 95605

Phone : (916) 376-3824

Location

Coordinates
33°56'59"N 117°38'9"W
Cities
Chino
Counties
San Bernardino
Cross Streets
Cucamonga Ave and Chino Corona Rd
Zip
92880
Total Acres
9.6
Parcel #
1057-191-05
State Highways
83, 71
Airports
Chino Airport
Schools
Cal Aero Preserve
Waterways
Prado Reservoir, Chino Creek

Notice of Determination

Approving Agency
DGS
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
707 3rd St., MS #509, West Sacramento, CA 95605

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.