Operations of Liberty Utilities - Lynwood - Compton East Water System Reservoir and Booster Pump Station Project (Project)
2 Documents in Project
Summary
SCH Number
2018041013
Lead Agency
State Water Resources Control Board
Document Title
Operations of Liberty Utilities - Lynwood - Compton East Water System Reservoir and Booster Pump Station Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2018
Present Land Use
PLUD: Vacant lot/Z: Limited commercial
Document Description
The SWRCB as the lead agency will be issuing a water supply permit for this Project. The project involves construction of a 650,000 gallon (0.65 MG) water reservoir and booster pump station to serve existing customers. The project will add reservoir capacity and a booster pump station to the Compton East Water System to allow for storage reliability in the system that does not have reservoir capacity. The project would include construction of an above ground pre-stressed concrete reservoir; 69.5 feet in diameter and 26 feet above grade with the base of the reservoir four feet below ground, a booster pump station and building of block masonry wall construction with associated valves and electrical connections, a 6-foot high block masonry wall surrounding the east, west and south perimeter, a 6-foot high tubular steel fence with a 20' wide gate, and landscaping on the East Rosecrans Avenue frontage.
Contact Information
Name
Shu-Fang Orr
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Compton
Counties
Los Angeles
Cross Streets
S Harris Ave and S Butler Ave
Zip
90221
Total Acres
0.5
Parcel #
6195-008-048
State Highways
I-105, 710, SR 91
Schools
Roosevelt ES
Waterways
LA River
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.