Operations of Liberty Utilities - Lynwood - Compton East Water System Reservoir and Booster Pump Station Project (Project)

2 Documents in Project

Summary

SCH Number
2018041013
Lead Agency
State Water Resources Control Board
Document Title
Operations of Liberty Utilities - Lynwood - Compton East Water System Reservoir and Booster Pump Station Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2018
Present Land Use
PLUD: Vacant lot/Z: Limited commercial

Document Description
The SWRCB as the lead agency will be issuing a water supply permit for this Project. The project involves construction of a 650,000 gallon (0.65 MG) water reservoir and booster pump station to serve existing customers. The project will add reservoir capacity and a booster pump station to the Compton East Water System to allow for storage reliability in the system that does not have reservoir capacity. The project would include construction of an above ground pre-stressed concrete reservoir; 69.5 feet in diameter and 26 feet above grade with the base of the reservoir four feet below ground, a booster pump station and building of block masonry wall construction with associated valves and electrical connections, a 6-foot high block masonry wall surrounding the east, west and south perimeter, a 6-foot high tubular steel fence with a 20' wide gate, and landscaping on the East Rosecrans Avenue frontage.

Contact Information
Shu-Fang Orr
State Water Resources Control Board
500 North Central Ave., Suite 500
Glendale, CA 91203

Phone : (818) 551-2004

Location

Coordinates
33°54'11.8"N 118°11'53.1"W
Cities
Compton
Counties
Los Angeles
Cross Streets
S Harris Ave and S Butler Ave
Zip
90221
Total Acres
0.5
Parcel #
6195-008-048
State Highways
I-105, 710, SR 91
Schools
Roosevelt ES
Waterways
LA River

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
500 N. central Ave., Suite 500, Glendale, CA 91203

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes