John Adams Academy - El Dorado Hills Campus

3 Documents in Project

Summary

SCH Number
2018032074
Lead Agency
John Adams Academy (JAA)
Document Title
John Adams Academy - El Dorado Hills Campus
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2018
Present Land Use
research and development
Document Description
The El Dorado Hills campus would be established at 1102 Investment Blvd and would replace an existing temporary campus located at 4250 Town Center Blvd in El Dorado Hills. The existing building at this location is approx 71,566 sf. Renovation and construction activities are anticipated to begin in May 2018 and be completed by August 2018. Interior tenant improvements would be required to convert the existing facility to school campus. It is anticipated that the renovations would include the construction of at least 36 classrooms, a library, and a multi-purpose room with both a gym floor and stage for performing arts productions for capacity of 900 students. Exterior construction activities would be minor and include the restoration of an existing baseball field and volleyball court just south of the existing building and associated parking lot.

Contact Information

Name
Joseph Benson
Agency Name
John Adams Academy
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Investment Blvd and Robert J Mathews Parkway
Zip
95762
Total Acres
10.4
Parcel #
117-010-151
Schools
Valley View ES
Township
9N
Range
8E
Section
24
Base
MD
Other Location Info
El Dorado Hills

Notice of Determination

Approving Agency
John Adams Academies Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.