Phillips 66 - Line 200, Dig 500 Project (Lake or Streambed Alteration Agreement No. 1600-2018-0270-R3)

6 Documents in Project

Summary

SCH Number
2018032056
Lead Agency
East Contra Costa County Habitat Conservancy
Document Title
Phillips 66 - Line 200, Dig 500 Project (Lake or Streambed Alteration Agreement No. 1600-2018-0270-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/29/2018
Present Land Use
A-2, A-3, A-4/AL, PR

Document Description
The CDFW has executed Lake and Streambed Alteration Agreement number 1600-2018-0270-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Phillips 66 Pipeline, LLC. The project is limited to investigation and repair of a 16-inch diameter crude oil pipeline. An excavator or backhoe will be used to dig down to the top of the pipe at approximately three feet below the ground surface. the trench will be approximately six feet deep Once the pipeline is exposed, shoring will be placed in the excavation. The existing corrosion protection wrapping will be removed from the area around anomaly. The pipe will then be sandblasted to remove residual coating and other debris. The anomaly will be investigated and repaired. The repaired and adjoining sandblasted portions of the pipeline will be coated in an epoxy corrosion barrier and allowed to cure. The excavation will be backfilled and compacted to meet original grade.

Contact Information
Andrea Boertien
CDFW, Bay Delta region
2825 Cordelia Road, suite 100
Fairfield, CA 95434

Phone : (209) 234-3449

Location

Coordinates
37.8780945°'"N 121.8096182°'"W
Cities
Antioch Byron Clayton
Counties
Contra Costa
Total Acres
1.5
Parcel #
080-050-003
Waterways
Sycamore Creek
Township
1s
Range
1e
Section
1

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
2825 Cordelia Road, Suite 100, Fairfield, CA 95434

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search