NP Oakley Facility Building 5 Area Cleanup

6 Documents in Project

Summary

SCH Number
2018032039
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
NP Oakley Facility Building 5 Area Cleanup
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2022
Document Description
The Department of Toxic Substances Control (DTSC) has prepared the Corrective Measures Decision (CMD) for Building 5 Area Cleanup at the NP Oakley Facility. The CMD summarizes previous investigations and the remedy that was presented in the Corrective Measures Proposal (CMP), which was previously issued for public comment. The CMD selected cleanup measures that are required to protect human health and the environment, and to address subsurface contamination in the Building 5 Area. The Building 5 Area was contaminated by NorthPoint’s release of partially treated groundwater to the Building 5 infiltration area. DTSC’s selected remedy for the Building 5 Area includes the following elements: 1. Interim time-critical soil removal (already completed) 2. Long-Term Groundwater monitoring 3. Building 5 Sub-slab vapor intrusion mitigation system (VIMS) 4. Land Use Controls

Contact Information

Name
Katherine Henry
Agency Name
Department of Toxic Substances Control
Job Title
Project Manager
Contact Types
Lead/Public Agency

Location

Cities
Oakley
Counties
Contra Costa
Regions
San Francisco Bay Area
Other Location Info
6000 Bridgehead Road, Oakley

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Mitigated Negative Declaration Addendum )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.