San Benito High School Modernization Project Removal Action Workplan

6 Documents in Project

Summary

SCH Number
2018031086
Lead Agency
San Benito High School District
Document Title
San Benito High School Modernization Project Removal Action Workplan
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2023
Document Description
The Department of Toxic Substances (DTSC) approved the San Benito High School Modernization Project (Project Site) Removal Action Workplan (RAW) located at 1220 Monterey Street, Hollister. The cleanup decision document, referred to as a RAW, specified the removal action objectives, identified the contaminants of concerns (COCs), and evaluated alternative remediation proposed for the Project Site. The Project activities consist of the excavation of approximately 645 cubic yards of soil impacted with lead at concentrations that exceed the Screening Level. The soil will be excavated, stockpiled, and sorted onsite. Following sorting, stockpiled soil will be loaded into trucks and transported for off-Site disposal at a permitted facility. Confirmation sampling will take place following completion of soil excavation and removal to ensure that all contaminated soil is removed from the Project Site.

Contact Information

Name
Elizabeth Tisdale
Agency Name
Department of Toxic Substances Control
Job Title
Project Manager
Contact Types
Responsible Agency

Location

Cities
Hollister
Counties
San Benito
Regions
Southern California
Zip
95023
Schools
San Benito High School
Other Location Info
1220 Monterey Street, Hollister

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Benito
Final Environmental Document Available at
https://www.envirostor.dtsc.ca.gov/public/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to the Initial Study/ Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print