Twain Main Portable Campus Project
2 Documents in Project
Summary
SCH Number
2018031068
Lead Agency
San Diego Unified School District
Document Title
Twain Main Portable Campus Project
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2018
Present Land Use
HS/Res-multiple unit (RM-1-1)/School
Document Description
The proposed project includes the installation of 13 portable and relocatable classroom buildings, one portable administration building, and one relocatable restroom building on the Twain Main campus. Additional site work includes the provision of asphalt pads/foundations and all utilities for each portable and relocatable building, as well as minor trenching for utility connections. The portable and relocatable buildings would accommodate a new charter high school with an enrollment of approx.. 380 students at buildout on a portion of the existing Twain Main campus. No changes to the student enrollment or capacity of the Twain Main campus would occur.
Contact Information
Name
Paul Garcia
Agency Name
San Diego Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Linda Vista Rd and Alcala Knolls Dr
Zip
92111
Total Acres
1
Parcel #
4370101800
State Highways
I-5, I-8, SR 163
Railways
MTS
Schools
Bay Park ES, iHigh Virt
Waterways
San Diego River, Mission Bay
Other Location Info
Linda Vista
Notice of Determination
Approving Agency
San Diego Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.