Permit No. 19453- Madera County - Bridge No. 41C0032 Avenue 25 over Ash Slough

3 Documents in Project

Summary

SCH Number
2018031043
Lead Agency
Madera County
Document Title
Permit No. 19453- Madera County - Bridge No. 41C0032 Avenue 25 over Ash Slough
Document Type
NOD - Notice of Determination
Received
Posted
9/2/2020
Project Applicant
Madera County

Document Description
Approval of Permit No. 19453, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To replace the existing Avenue 25 bridge over Ash Slough with a 9-span cast-in-place reinforced concrete slab bridge. The proposed bridge will span approximate 319-feet and will have two 12-foot travel lanes.

Contact Information
Itzia A Rivera
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

Phone : (916) 480-5388
itzia.rivera@cvflood.ca.gov

Location

Cities
Chowchilla
Counties
Madera
Other Information
The project is located where Avenue 25 crosses Ash Slough approximately 2.6 miles west of the intersection of Avenue 25 (Washington Boulevard) and CA State Highway 233, in the City of Chowchilla, in Madera County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Board's administrative record of proceedings related to the encroachment permit is available for public review at the Board's office. Please note the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: Itzia.Rivera@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print