Permit No. 19453- Madera County - Bridge No. 41C0032 Avenue 25 over Ash Slough
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018031043
- Lead Agency
- Madera County
- Document Title
- Permit No. 19453- Madera County - Bridge No. 41C0032 Avenue 25 over Ash Slough
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/2/2020
- Document Description
- Approval of Permit No. 19453, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To replace the existing Avenue 25 bridge over Ash Slough with a 9-span cast-in-place reinforced concrete slab bridge. The proposed bridge will span approximate 319-feet and will have two 12-foot travel lanes.
- Contact Information
-
Itzia A Rivera
Central Valley Flood Protection Board
Lead/Public Agency
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821
Phone : (916) 480-5388
itzia.rivera@cvflood.ca.gov -
Madera County
Project Applicant
Location
- Cities
- Chowchilla
- Counties
- Madera
- Other Information
- The project is located where Avenue 25 crosses Ash Slough approximately 2.6 miles west of the intersection of Avenue 25 (Washington Boulevard) and CA State Highway 233, in the City of Chowchilla, in Madera County.
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- The environmental document is available to the general public at the lead agency's office. The Board's administrative record of proceedings related to the encroachment permit is available for public review at the Board's office. Please note the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: Itzia.Rivera@cvflood.ca.gov.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes